Fees
Building Permit Fee Schedule - Effective June 1, 2022
- New Dwellings: $12.00 per $1,000 construction cost*
- Construction cost is calculated as follows: Total finished area X International Code Council Building Valuation Data
- Garages: $10.00 per $1,000 construction cost (minimum $50)
- Additions: $10.00 per $1,000 construction cost (minimum $50)
- Alterations: $10.00 per $1,000 construction cost (minimum $50)
- Porches/Sunrooms: $10.00 per $1,000 construction cost (minimum $50)
- Decks: $10.00 per $1,000 construction cost (minimum $50)
- Barns: $10.00 per $1,000 construction cost (minimum $50)
- Weatherization: $10.00 per $1,000 construction cost (minimum $50)
- Foundations: $200.00
- Sheds: 10.00 per $1,000 construction cost (minimum $50)
- Pools, In-ground: 10.00 per $1,000 construction cost (minimum $50)
- Pools, Above Ground10.00 per $1,000 construction cost (minimum $50)
- Solar Systems: 10.00 per $1,000 construction cost (minimum $50)
- Re-Roof: 10.00 per $1,000 construction cost (minimum $50)
- Siding: 10.00 per $1,000 construction cost (minimum $50)
- Signs: 10.00 per $1,000 construction cost (minimum $50)
- Carnival: $75.00
- Tents: $50.00 per tent
- Temporary Buildings: $50.00
- Demolition: 10.00 per $1,000 construction cost (minimum $50)
- Temporary Occupancy (30 days): $50.00
- Certificate of Occupancy: $50.00
- Re-Inspection: $50.00
- Work without a Permit Double the Required Fee + $100.00
- Miscellaneous Permits: $50.00
- Commercial/Industrial: $13.50 per $1,000 construction cost
- Wood Stove: $50.00
- Permit Entry Fee: $50.00 (Voted 4/25/19)
Fees Voted Fees Voted 4/7/22