Fees

 Building Permit Fee Schedule - Effective June 1, 2022

  • New Dwellings: $12.00 per $1,000 construction cost*
    • Construction cost is calculated as follows: Total finished area X International Code Council Building Valuation Data
  • Garages: $10.00 per $1,000 construction cost (minimum $50)
  • Additions: $10.00 per $1,000 construction cost (minimum $50)
  • Alterations: $10.00 per $1,000 construction cost (minimum $50)
  • Porches/Sunrooms: $10.00 per $1,000 construction cost (minimum $50)
  • Decks: $10.00 per $1,000 construction cost (minimum $50)
  • Barns: $10.00 per $1,000 construction cost (minimum $50)
  • Weatherization: $10.00 per $1,000 construction cost (minimum $50)
  • Foundations: $200.00
  • Sheds: 10.00 per $1,000 construction cost (minimum $50)
  • Pools, In-ground: 10.00 per $1,000 construction cost (minimum $50)
  • Pools, Above Ground10.00 per $1,000 construction cost (minimum $50)
  • Solar Systems: 10.00 per $1,000 construction cost (minimum $50)
  • Re-Roof: 10.00 per $1,000 construction cost (minimum $50)
  • Siding: 10.00 per $1,000 construction cost (minimum $50)
  • Signs: 10.00 per $1,000 construction cost (minimum $50)
  • Carnival: $75.00
  • Tents: $50.00 per tent
  • Temporary Buildings: $50.00
  • Demolition: 10.00 per $1,000 construction cost (minimum $50)
  • Temporary Occupancy (30 days): $50.00
  • Certificate of Occupancy: $50.00
  • Re-Inspection: $50.00
  • Work without a Permit Double the Required Fee + $100.00
  • Miscellaneous Permits: $50.00
  • Commercial/Industrial: $13.50 per $1,000 construction cost
  • Wood Stove: $50.00
  • Permit Entry Fee: $50.00 (Voted 4/25/19)

Fees Voted Fees Voted  4/7/22